ZHANG Changming;Ewirgol Coal Preparation Plant,Xinjiang Coking Coal Group Co.,Ltd.;The analysis of Shagou raw coal show that,NO.1 coal is medium-ash,fragile,difficult-washed coal,which contains large slime and gangue.NO.2 coal is high-ash,ultra-washed coal,while the nature of NO.3 coal is opposite to that of NO.2 coal.NO.2 and NO.3 coal contain parting and large slime.Based on the products structure and equipments selection of Shagou coal preparation plant,divide the process into raw coal preparation system,desliming system,demedium and dewatering system,TBS raw slime separation system,medium recycling system,flotation and slime water treatment system.Determine the final separation process:Gangue whose particle size ranges from 100mm to 50 mm is removed by moving sieve,separate 50.0 mm to 1.0 mm particle,1.00 mm to 0.25 mm raw slime,-0.25 mm fine slime with pressurized three-product dense medium cyclone,TBS and flotation machine respectively.Layout main workshop,preparation,concentration and product workshop,conveying belt corridor.The optimization design has lots of advantages such as reasonable products structure,advance separation method and equipments,high automaticity,convenient for operation and maintenance.
2013 05 v.19 [Abstract][OnlineView][Download 673K]