Clean Coal Technology

2005, (04) 23-25

[Print This Page] [Close]
Current Issue | Archive | Advanced Search

Primary Study on Slime Water Treatment in Zhangji Coal Preparation Plant

YANG Chun-lan;FAN Xiao-nan(Material Science and Engineering Department;

Abstract:

The improved method of slime water treatment system was put forward through analysis of slime water treatment system problem of zhangji coal preparation plant.The method reduces the slime water concentration and keeps the circulation water concentration in a good interval range,which ensures continuous and normal operation of coal Jigging process and close circulation.Meanwhile,a good effect can be gained.

Key Words: slime water treatment system;process;closed circulation

Abstract:

Keywords:

Foundation:

Author: YANG Chun-lan;FAN Xiao-nan(Material Science and Engineering Department;

DOI: 10.13226/j.issn.1006-6772.2005.04.006

Accessibility
Information
Service
Key Words
The author of this article
Cnki
Share